Kingfish Bay CONSTRUCTION UPDATES Tuesday 07/31/18

July 31, 2018

Check out July 31st’s Kingfish Bay Construction Updates.

A lot has happened! Lookin’ good!

B-14 Angelfish

  • Carpet has been installed
  • Plumbing fixtures have been installed
  • Ceramic tile in the shower has been installed
  • Countertops, cabinets and backsplash have been installed

 

B-17 Angelfish

  • Started to paint the exterior
  • Installed sheetrock

 

CV-3 Marlin

  • Completed the landscaping
  • Set appliances
  • Installed pavers in the back courtyard area

 

CV-10 Marlin

  • Installed ceramic tile in the shower
  • Installed flooring finishes
  • Installed cabinets, countertops, and backsplash
  • Installed pavers and adding sod in the backyard
  • Completed the landscaping in the front

 

CV-7 Tarpon

  • Installed countertops, cabinets and backsplash
  • Starting to install the flooring finishes
  • Installed pavers in the courtyard area
  • Preparing to add plants to the landscape in the front and back

 

CV-9 Tarpon

  • Installed ceramic tile in the shower
  • Installed plumbing fixtures
  • Installed cabinets, countertops, and backsplash
  • Installed floor finishes
  • Installed pavers in the backyard

 

C-7 Albacore II

  • Installed interior lighting fixtures
  • Completed the design of the fireplace
  • Installed the flooring finishes
  • Completing trim work
  • Installed cabinets and countertops

 

B-1 Seahorse

  • Cabinets, countertops and backsplash has been installed
  • Plumbing fixtures have been installed
  • Tile has been installed in the shower
  • Floor finishes have been installed