Homes are springing up everywhere at Kingfish Bay! Happy Spring Equinox!
- Insulation installed in Angelfish B-12
- C-8 Albacore has been sold and closed.
- Second floor roof trusses set on C-4 Albacore II
- Sheathing is being installed on C-4 Albacore II
- C-7 Albacore II foundation is framed waiting on permit
- Interior light fixtures installed on CV-5 Tarpon
- Master bath shower prepped for tile installation in CV-5, CV-7, and CV-9 Tarpons.
- First coat of interior paint completed for CV-9 Tarpon and CV-10 Marlin.
- Phase 1 B has been graded
- Grading Phase 2