Weekly Update: April 10, 2018
April 10, 2018Check out April 10th’s Kingfish Bay Construction Updates!
Homes that enhance a natural living experience!
- Starting to frame second floor covered Loggia on Angelfish B-11
- Sanding drywall to prepare for interior paint on Angelfish B-12 and Bonita C-9
- Flooring has been installed for CV-5 Tarpon
- Countertops have been installed in Kitchen and Bathrooms for CV-5 Tarpon
- Shelving and organizing unit has been installed in the master closet in CV-5 Tarpon
- Starting to tile the pool for CV-5 Tarpon
- Added palm trees to the landscape around CV-1 Tarpon
- Framed sidewalks to prepare for concrete on CV-7, CV-9, and CV-10
- Installed kitchen and bathroom countertops in C-10 Albacore
- Appliances are in C-10 Albacore
- Running underground electric for the Courtyard Villas
- More plants have been delivered for landscaping
https://youtu.be/Lt2EHvRMb2M