Weekly Update: July 18, 2019
July 18, 2019Check out July 18th’s Kingfish Bay Construction Updates.
A laid-back atmosphere amidst the natural beauty of the Carolina Coast!
- Shower door installed C-14 Albacore II
- Cabinets installed C-55 Albacore II
- Windows set in CV-8 Longfin
- HVAC trim out CV-8 Longfin
- Roof installed on CV-14 Longfin
- Continuing to install siding CV-18 Longfin
- Rebar for the pool C-41 Anchor Coral II
- Countertop installed C-41 Anchor Coral II
- Framing B-25 Angelfish
- Slab poured for B-31 Seahorse