Isn’t it time to LIVE RELAXED at Kingfish Bay?
- Installed bathroom countertops CV-8 Longfin
- Installed cabinets CV-8 Longfin
- Interior lighting CV-18 Longfin
- CV-17 Tarpon underroof
- Installing tile flooring C-13 Anchor Coral II
- Decorative knee wall C-13 Anchor Coral II
- Working on the second-floor porch B-25 Angelfish
- Drywall B-31 Seahorse
- Painted exterior SF-27 Amberjack
- Taping drywall SF-27 Amberjack
- Foundation ready for slab C-23 Parrot Fish II
- Starting to tile the pool C-32 Parrot Fish II