Latest News

Weekly Update: September 26, 2019

September 26, 2019

Check out September 26th’s Kingfish Bay Construction Updates.

FALL in Love with Kingfish Bay!

  • Flooring installed CV-8 Longfin
  • Concrete shot for pool CV-14 Longfin
  • Windows set for CV-17 Tarpon
  • Poured driveway for C-13 Anchor Coral II
  • Retaining wall behind C-41 Anchor Coral II
  • Pavers installed for pool C-41 Anchor Coral II
  • Poured front walkway for B-25 Angelfish
  • Framing B-28 Angelfish
  • Graded B-2 Seahorse to prep for slab
  • Framing C-23 Parrot Fish II