Weekly Update: July 21, 2020
July 21, 2020Kingfish Bay … the place to live and play!
Check out July 21st’s Kingfish Bay Construction Updates.
- Screened in porch C-42 Albacore II
- Plumbing fixtures C-42 Albacore II
- Final plumbing trim out C-49 Albacore II
- Appliances set C-49 Albacore II
- Shower tiled CV-19 Longfin Elevation II
- Bathroom cabinets CV-19 Longfin Elevation II
- Flooring CV-19 Longfin Elevation II
- Laundry cabinets CV-19 Longfin Elevation II
- Sidewalk/walkway entrance CV-19 Longfin Elevation II
- Flooring C-25 Anchor Coral II
- Cabinets C-25 Anchor Coral II
- Palm trees planted B-24 Angelfish
- Landscaping complete B-30 Seahorse
- Landscaping complete B-34 Seahorse
- Pool C-23 Parrotfish II
- Palm trees SF-31 Sea Star
- Laundry room cabinets SF-31 Sea Star
- Pool SF-31 Sea Star
- Plumbing fixtures SF-31 Sea Star
- Cable on veranda SF-31 Sea Star
- Driveway SF-31 Sea Star
- Shower tiled SF-25 Bluefin
- Bathroom floor tiled SF-25 Bluefin
- 2nd level shower tiled Sf-25 Bluefin
- Waterfront park area