April 30, 2019Check out April 30th’s Kingfish Bay Construction Updates.
Homes designed to enhance a natural living experience.
- Pool C-15 Anchor Coral
- Interior light fixtures installed C-15 Anchor Coral
- Starting to frame C-41 Anchor Coral II
- Installed mirrors in C-5 Cobia
- Siding C-14 Albacore II
- Painting the exterior of CV-15 Tarpon
- Framed the exterior stairs CV-15 Tarpon
- Sheetrock installed CV-20 Longfin
- Painting the exterior CV-20 Longfin
- Insulation in B-20 Seahorse
- Rough electrical and plumbing B-20 Seahorse
- Installing the roof on B-20 Seahorse
- Fence is installed behind the cottages in phase 1B