- Countertops CV-19 Longfin Elevation II
- Plumbing fixtures CV-19 Longfin Elevation II
- Under slab plumbing B-18 Seahorse
- SF-31 Sea Star front landscaping
- SF-31 Sea Star pool area (3 pics)
- SF-31 Sea Star sod (2 pics)
- Graded C-20 Albacore
- Foundation framed C-54 Bonita
- B-4 Sand Dollar basement
- Installing thatched roofing waterfront cabanas