- Added more shrubs/bushes to the exterior of B-32 Seahorse
- Painting the interior of C-5 Cobia
- Installed tub in C-15 Anchor Coral
- Installed the metal roofing and shingles for C-15 Anchor Coral
- Installed the fireplace in C-15 Anchor Coral
- Installed the cabinets in C-17 Albacore
- Added the shiplap accent to the knee wall in the kitchen of C-17 Albacore
- Painted the exterior trim of C-17 Albacore