  • Flooring installed C-12 Albacore II
  • Tile C-12 Albacore II
  • Driveway and sidewalk poured C-40 Albacore II
  • Framed foundation and under slab plumbing CV-16 Longfin
  • Driveway and sidewalk poured C-38 Anchor Coral II
  • Foundation framed and under slab plumbing B-34 Seahorse
  • Framed for driveway and sidewalk C-43 Hawkfish
  • Rough plumbing trim out and starting HVAC trim out SF-31 Sea Star