Weekly Update: July 18, 2019

July 18, 2019

Check out July 18th’s Kingfish Bay Construction Updates.

A laid-back atmosphere amidst the natural beauty of the Carolina Coast!

  • Shower door installed C-14 Albacore II
  • Cabinets installed C-55 Albacore II
  • Windows set in CV-8 Longfin
  • HVAC trim out CV-8 Longfin
  • Roof installed on CV-14 Longfin
  • Continuing to install siding CV-18 Longfin
  • Rebar for the pool C-41 Anchor Coral II
  • Countertop installed C-41 Anchor Coral II
  • Framing B-25 Angelfish
  • Slab poured for B-31 Seahorse