Check out July 3rd’s Kingfish Bay Construction Updates.

The inside is just as beautiful as what’s outside … beauty throughout!

  • Countertops installed in Angelfish B-14
  • Flooring installed in B-14 Angelfish
  • Wet Bar and cabinets installed for Angelfish B-14
  • Installed the flooring in CV-4 Marlin
  • Starting to install kitchen cabinets in C-7 Albacore II
  • Installing shiplap in C-7 Albacore II Master Bedroom
  • Completed the under slab plumbing for the Longfin on CV-6

 

https://youtu.be/Q3fZIOFtWHM