- Drywall up and taped C-14 Albacore II
- Caulking the exterior C-14 Albacore II
- Under slab plumbing C-55 Albacore II
- Still painting exterior trim of CV-15 Tarpon
- Drywall up and taped CV-15 Tarpon
- Floor tile installed in both bathrooms CV-20 Longfin
- Shower tiled in CV-20 Longfin
- Interior first coat of paint CV-20 Longfin
- Drywall up and taped B-20 Seahorse
- Tub installed in guest bath B-20 Seahorse
- Siding completely installed B-20 Seahorse
- Framing and sheathing C-41 Anchor Coral II