Check out May 7th’s Kingfish Bay Construction Updates.
- Siding C-49 Albacore II
- Final plumbing trim CV-16 Longfin
- Countertops CV-16 Longfin
- Flooring CV-16 Longfin
- Pool tile trim CV-16 Longfin
- Mirror and bath accessories CV-16 Longfin
- Interior trim C-25 Anchor Coral II
- Dry bar cabinets SF-31 Sea Star
- Master bath cabinets SF-31 Sea Star
- Master shower tile SF-31 Sea Star
- Floor tile in 2nd floor bath SF-31 Sea Star
- Cabinet 2nd floor bath SF-31 Sea Star
- Kitchen cabinets SF-31 Sea Star
- Windows set SF-25 Blue Fin