Check out May 7th’s Kingfish Bay Construction Updates.

  • Siding C-49 Albacore II
  • Final plumbing trim CV-16 Longfin
  • Countertops CV-16 Longfin
  • Flooring CV-16 Longfin
  • Pool tile trim CV-16 Longfin
  • Mirror and bath accessories CV-16 Longfin          
  • Interior trim C-25 Anchor Coral II
  • Dry bar cabinets SF-31 Sea Star
  • Master bath cabinets SF-31 Sea Star
  • Master shower tile SF-31 Sea Star
  • Floor tile in 2nd floor bath SF-31 Sea Star
  • Cabinet 2nd floor bath SF-31 Sea Star
  • Kitchen cabinets SF-31 Sea Star
  • Windows set SF-25 Blue Fin