  • Pouring concrete for driveway C-20 Albacore
  • Interior light fixtures C-36 Albacore
  • Painted exterior B-26 Angelfish
  • Starting siding installation B-27 Angelfish
  • Painted exterior C-39 Mako
  • Framed driveway for concrete C-54 Bonita
  • Painted exterior C-19 Parrotfish II
  • Graded lot SF-29 Orchid II
  • Flooring B-4 Sand Dollar
  • Mirrors installed B-4 Sand Dollar
  • Appliances B-4 Sand Dollar
  • Slab poured WSF-12 Bowfin