September 26, 2019Check out September 26th’s Kingfish Bay Construction Updates.
FALL in Love with Kingfish Bay!
- Flooring installed CV-8 Longfin
- Concrete shot for pool CV-14 Longfin
- Windows set for CV-17 Tarpon
- Poured driveway for C-13 Anchor Coral II
- Retaining wall behind C-41 Anchor Coral II
- Pavers installed for pool C-41 Anchor Coral II
- Poured front walkway for B-25 Angelfish
- Framing B-28 Angelfish
- Graded B-2 Seahorse to prep for slab
- Framing C-23 Parrot Fish II